Tero Koskela
Finally it's done to bend those damn pipes
Injector pipe planning for the DV6 – finding the path from source to injector. Halfway there!
Oil pan installation,Fuel pump setup,Engine timing adjustment,Exhaust system assembly.
Diesel pump holder final installation
Lot's of supporting things
Continue pump holder and drive gear
Start to build pump holder to DV6 Motor
Taking parts to painting
Flywheel balancing 8.4.2025
Turbo and water outlet installing
finishing exhaust and turbo holder
Turbo line and oil return finishing
Finishing the top mounts 23.3.2025
Gazaile DV6C turbo motor build 17-19.3.2025
11.3.2025 Gaz'aile 2 motor build
3.3.2025 Gaz'aile 2 engine build
21.2.2025 Gazaile 2 motor building
13.2.2025 intercooler build continue
12.2.2025 Gaz'aile 2 motor building in ylivieska finland
6.2.2025
29.1.2025 Gearbox build
28.1.2025 Gazaile2 motor build
Gaz'aile 2 DV6C motor standoff and turbo support
12-14.1.2025 DV6C Motor build
6.1.2025 DV6C Motor build
Kärkkäinen kone CFMoto myynti
1.1.2025 DV6C Motor build
28.12.2024 DV6C Motor build