Engineer Zubair
Quality Control
Fillet weld Leg length and throat thickness
Hardness Test
Radio Graphic Testing || RT Shoot
welder Qualification Test WQT
deep anode bed installation for cathodic protecrion system
cathodic protection system, easy way to understand
Oil Gathering Manifold and pipeline (OGM)
wet bulb Temp and dry bulb Temp.
Relative Humidity
cathodic protecrion Systen
How to renewal PMP certificate after 3 years
RT Film review RTFI, welding
Heat shrinkable sleeve
cathodic protection and CP test pole installation
Welding procedure specifications
weld build up
Gas cutting of pipe
Welding Electrode Selection for Carbon steel pipe and plate
Travel to Iraq
Heat Shrinkable sleeve peel test
Heavy equipment lifting and installation
isometric drawing for piping
erection and Installation of steel structure for Chemical Injection CI skid
vacuum box test for tank bottom leak
RED Dye Inspection
how to installation of Glass Reinforce Epoxy GRE pipe.