I welcome all of you to my Channel Power plant with Rahul.Myself Rahul Kumar,a Mechanical Engineer, working in Thermal power plant as an operation & maintenance Engineer. I have vast experience of around 15 years in the field of power plant operation working in the control room.I have created this channel only for sharing my experience as an operation engineer.I will make videos on power plant operation related topics which will be beneficial to all newcomers in operation section. Operation section of thermal power plant is a vast field ,pure technical field where you can learn more and more knowledge.
you may contact me at this mail.
my email ID - [email protected]
OVERVIEW OF FEED WATER CYCLE IN DCS PAGE| FUNCTION OF ECONOMISER R/C VALVE| BASIC INFORMATION|
ISOLATION PROCEDURE OF MDBFP| CHANGEOVER PROCESS OF R/C VALVE OF BFP| STEPWISE OPERATIONAL DETAILS|
STANDARD OPERATING PROCEDURES FOR STARTING OF MDBFP AFTER LINE UP| IMPORTANT TOPIC FOR BEGINNERS|
STANDARD OPERATING PROCEDURES FOR STARTING OF MDBFP| MDBFP FILLING PROCEDURE| STEPWISE DETAILS|
STANDARD OPERATING PROCEDURES FOR MDBFP LINE UP| PRE CHECK TO LINE UP OF MDBFP| STEPWISE DETAILS|
HYDRAULIC BALANCING ARRANGEMENT IN BOILER FEED PUMP| REASON OF U-BEND SHAPE IN BALANCING LINE|
MECHANICAL SEAL & JACKET COOLING SYSTEM| CIRCUIT DIAGRAM WITH DETAILED INFORMATION| FILTER & COOLER|
MDBFP AOP AUTO START/ AUTO CLOSE LOGIC| WHY DOES AOP IN A STANDBY MDBFP SYSTEM RUN CONTINUOUSLY?|
AUTO STANDBY START LOGIC OF MDBFP| RECIRCULATION VALVE AUTO OPEN/AUTO CLOSE/ PROTECTION OPEN LOGIC|
MDBFP INTERLOCK & PROTECTION| PART#2|MDBFP TRIP PROTECTION LOGIC| IMPORTANT FOR OPERATION ENGINEERS|
MDBFP INTERLOCK & PROTECTION| PART#1| MDBFP START PREMISSIVE LOGIC| BASIC INFORMATION|
MECHANICAL SEAL| PART#1| HOW DOES IT PREVENT LEAKAGE FROM PUMP| INTERNAL COMPONENTS & IT'S FUNCTION|
ЛОКАЛЬНЫЙ ОБЗОР СИСТЕМЫ УПРАВЛЕНИЯ ШАГОМ ЛОПАТОК ВЕНТИЛЯТОРА ПЕРВИЧНОГО ВОЗДУХА | ДВУХСТУПЕНЧАТЫЙ...
BOILER FEED PUMP ( BFP)| CONSTRUCTION DETAILS| BASKET & CONICAL STRAINER| FEEDWATER FLOW ARRANGEMENT
BOOSTER PUMP| WHY DO WE USE IN POWER PLANT| IT'S IMPORTANCE| INTERNAL STRUCTURE| TECHNICAL DATA|
OVERVIEW OF FEED WATER CYCLE| SUPERHEATER SPRAY|LOW LOAD & HIGH LOAD FLOW LINE|50% &100% BYPASS LINE
TDBFP ROLLING & LOADING OPERATION IN DCS| STEP BY STEP OPERATIONAL PROCEDURES| BEST FOR BEGINNERS|
OPERATIONAL PROCEDURE TO OPEN/ CLOSE RECIRCULATION VALVE OF BOILER FEED PUMP IN DCS| DRUM LEVEL|
WHY CEP IS INSTALLED IN DEPTH BELOW THE HOTWELL?|NPSH-A & NPSH-R| HOW TO CALCULATE NPSH-A & NPSHR-3|
CEP CHARGING & CHANGEOVER PROCEDURE IN DCS PAGE| OPERATION OF CEP MIN R/C VALVE ,GSC MIN R/C VALVE|
STEPWISE LINE UP PROCEDURE OF CEP CHARGING WHEN CONDENSATE SYSTEM IS DEPRESSURIZED & HOTWELL EMPTY|
CHARGING OF CONDENSATE EXTRACTION PUMP ( CEP) UNDER VACUUM WHEN UNIT ON BAR| STEP BY STEP PROCESS|
CONDENSATE EXTRACTION PUMP: INTERLOCK & PROTECTION| START PERMISSIVE| TRIPPING LOGIC| BASIC DETAILS|
ISOLATION PROCEDURE OF CONDENSATE EXTRACTION PUMP UNDER VACUUM WHEN UNIT ON BAR| STEPWISE PROCESS|
LINE DIAGRAM OF CONDENSATE EXTRACTION PUMP ( CEP)| IMPELLER SHAFT| SUCTION & DISCHARGE LINE| DETAILS
STUFFING BOX & MECHANICAL SEAL OF CEP| HOW DOES IT WORK| TECHNICAL SPECIFICATIONS| BASIC INFORMATION
INTERNAL COMPONENT OF CEP| TOP, INTERMEDIATE & BOTTOM IMPELLER SHAFT| NO OF STAGE| THRUST BEARING|
CONDENSATE EXTRACTION PUMP(CEP)| WHY IT IS USED IN THERMAL POWER PLANT| IT'S IMPORTANT FUNCTION|
TARIFF DETERMINATION OF 660 MW THERMAL POWER PLANT| CALCULATION OF CAPACITY & ENERGY CHARGES| DETAIL
GENERATION COST CALCULATION FOR 660 MW THERMAL POWER PLANT WITH EXAMPLE|ANNUAL FIXED & ENERGY CHARGE