Bruce Bryant
They say it’s not a significant roadway.
Geothermal wells, fire blocking, insulation casa grande
J Mud Sill plate installation and what is an arc second.
68’ Glulam beam delivery J
J Void form foundation slab installation with cover board and steel rebar
Drexel Exterior Foundation Foam Insulation
J void form void slab 6” and rebar tie
People drilling holes in my buildings, this is next level
Barn floor Pre Deck Engineer walkthrough
J Pre-void form walk through
Barn Lift Slide Time Lapse Assembly shims and crane
Repairing “user Serviceable” 48v server rack battery.
Window, door and lift slide install detail talk
back at the remodel same day
Back at the remodel
JCB 510-56 with Sidewinder fork attachment
High performance window installation methods and details.
How to flip a 600# Lift Slide door panel in a low 10’ ceiling.
Replace Enersign Lift Slide Vertical seals
J foundation walkthrough and concrete core holes
Dens Deck fire resistant roof assembly walkthrough pre EPDM install.
parapet wall pre sheathing walkthrough
Pre Dens Deck plywood tape on roof.
Wall angle change, cut it with the diamond saw drag it out with the excavator 8” concrete
Cat 395 excavator leaving our mine fire excavation super load transport across intersection.
My friends and I build a barn timelapse
Demolition Day 2, Project 5 Video 3