Civil kudos
This Channel For Civil Engineer's who Are Professional, Fresher's, Student, Supervisor, billing Engineer etc.
Rockwool Insulation in Construction, Part-2 | Thermal, Acoustic ,Fireproof Material | Interior works
Rockwool Insulation in Construction, Part-1| Thermal, Acoustic, Fireproof &Material | Interior works
Bonding Agent Application Step-by-step Tutorial In Construction | Interior Works
Raised flooring Part-2 , Material Specification | Productivity | Market rate | Interior Works.
Raised flooring work , PART-1 | Full knowledge | Interior Works series
Fire Fighting Sprinkler System| Hydro test.
Wet area waterproofing works.
What We Do First Waterproofing Work OR Ledge Wall Work???
How a Civil Engineer Can Achieve Success
Retaining wall waterproofing | Methods , Testing , Market Rate | PART-2
Retaining wall waterproofing | Methods , Testing , Market Rate | PART-1
Kota Stone Polishing Work ( Methods , Type Of Polishing , Market Rate , Per Day Productivity )
Construction site Unsafe Pocklan loading.
C295 Landing Aircraft - At Navi mumbai international airport.
Adani Corporate Office Navratri celebrations.
sounding Test - Diaphragm wall #diaphragm
Reinforcement coupler Length l AS PER IS CODE : 16172
Cost Comparison Between Lapping & Coupler ( Threading / Cold Forging ) Process , AS PER IS CODE16172
Electrical Conduiting work , Portable M.S pipe bender machine at Construction site.
Column strengthening I Concrete Jacketing I घरों में पिलर (कॉलम )/ COLUMN को मजबूत कैसे करें
How to check Degree of Anchor pipe in Diaphragm wall.
Carpenter & Fitter Productivity
Thumbrule for construction
Shuttering vs Centering
Construction Site - Excavation Ramp Length & Ratio.
How to make DIAPHRAGM WALL Bill with Abstract Sheet , Measurement Sheet PART-2
How to make DIAPHRAGM WALL Bill with Abstract Sheet , Measurement Sheet And D-WALL BOQ Understanding
TOP 10 INTERVIEW QUESTION FOR CIVIL ENGINEERS
Diaphragm Wall Stop-End Lifting & Lowering With Waterbar