ABC Acres
ABC acres is the Permaculture child of Tim & Sarah Southwell located in Hamilton, Montana, USA. Started in 2012, ABC acres set forth as a Permaculture farmstead with the intent to weave regenerative farming practices alongside Mother Nature to provide an abundance for home and wildlife alike. A decade later, and still very much implementing Permaculture practices, ABC acres has grown in its adolescent years towards a Permaculture Preserve highlighting the rich nature setting at the hands of mindful agriculture practices working with the land, not against. Join us as we experience the Preserve while focusing our efforts on towards Permaculture Design Principles, Animal Husbandry, Fruit & Veg Production, Soil Health Regeneration, Water Harvesting, Micro-climate Creation and all round Holistic Land Management practices.
Episode #179: Montana morning chores at 0 degrees
Episode #178: Growing bananas in the banana belt of Montana
Episode #177: How does our tropical greenhouse work?
Episode #176: Growing Vegetables through fall without heat
Episode #175: ABC Update! The Tropical Botanical Garden
RMH Build A-Z: Day 4 F - Batch Box Firebox Brick Overview / Cont.
RMH Build A-Z: Day 4 E: Batch Box Firebrick Layout & Overview Cont.
RMH Build A-Z: Day 4 D - Batch Box Brick Layout & Overview
RMH Build A-Z: Day 4 C - Fire Box Overview Continued
RMH Build A-Z: Day 4 B - Fire Box Overview continued
RMH Build A-Z: Day 4 A - Fire Box Overview top to bottom
RMH Build A-Z: Day 3 D - Floor Layout and Prelim Brick Work
RMH Build A-Z: Day 3 C - Barrel Revisit & Install Prep
RMH Build A-Z: Day 3 B - Cob Building Continues
BIG NEWS! And Summer Updates
RMH Build A-Z: Day 3 A - Cob Testing, Prep, and Creation
RMH Build A-Z: Day 2L - Drum update, Floor Design & Install Continues
RMH Build A-Z: Day 2K -
RMH Build A-Z: Day 2J - Floor Layout and Install Commences
RMH Build A-Z: Day 2 I Stove Floor Layout
RMH Build A-Z: Day 2 H - Stove Floor Layout and Chimney Work
RMH Build A-Z: Day 2 G - Chimney work and floor layout
RMH Build A-Z: Day 2 F - Chimney Build / Drum Prep
RMH Build A-Z: Day 2 E - Cob Mix / Chimney Build
RMH Build A-Z: Day 2 D - Chimney Build
RMH Build A-Z: Day 2 C - Chimney Repair / Install
RMH Build A-Z: Day 2 B - Drum Prep / Clay Talk / Chimney Repair
RMH Build A-Z: Day 2 A - Drum Prep / Foundation & Chimney Work
RMH Build A-Z: Day 1 P - Riser Build / Drum Prep / Backwall Build
RMH Build A-Z: Day 1 O - Riser Build / Drum Prep / Backwall Build