Kulbhushan singh (Turbine Expert)
Turbine final assembly
Turbine bearing clearance measurement
Turbine 10 MW Bellies SBP 560
Steam Turbine ESV assembly part 2
Turbine casing boxup
Turbine rotor axial flote and dump testing with all internal
Turbine rotor runout checking 10 MW
Turbine ESV hydraulic part assembly
Turbine gearbox Runout checking (10 MW)
Turbine gearbox teeth matching 10 MW
Turbine rotor checking through runout
Turbine rotor runout dismantling time (10MW bellies)
Turbine Gear box Backless calculation
Turbine governing parameters and RPM are stable now after correction.
Turbine governing parameters need some tuning
Alternator air cooler hydraulic testing
Steam Turbine internal clearance with Rotor
Steam Turbine casing invert position
Steam Turbine bearing clearance checking
Steam Turbine bearing cover box up and Thrust flote checking
Steam Turbine thrust Pad assembly
Pump casing Work
Steam Turbine Rotor condition checking 10 MW
Turbine bearing clearance part 2
Turbine Bearing clearance part 1
Steam Turbine Rotor 10 MW Bellies SBP-560
steam Turbine bottom casing part 2 (Bellies 10 MW SBP-560)
Steam Turbine 10 MW bottom casing (Bellies SBP-560
Turbine rotor re-blading groove tamplate
Turbine oil cooler