Abdelaziz Gabr
As a senior drilling engineer, I decided to launch this channel in order to give different courses in petroleum engineering aspects in a professional way.
My goal is to help all students who have been graduated from universities to get the field experience as soon as possible to be ready for any technical interview in drilling and work over operation. My plan is to help drilling supervisors and mud engineer to work together without problems during drilling and work over. I hope the channel add a new value to me and to all the subscribers and spread the culture of scientific volunteering work .
Thanks
Abdelaziz Gabr
20. Lower Completion
20. Lower completion
19. Pipe conveyed logging
19. Pipe conveyed logging
18. Sidetrack drilling
18. Drilling sidetrack
17. Гидравлический отклонитель
16. Milling window for sidetrack
16. Milling window for sidetrack
15. Plug & Abandonment techniques
15. Plug & Abandonment techniques
14. Wellhead work
14. Wellhead work
13. Multi casing corrosion log
13. Multi casing corrosion logging
12. De-completion: Retrieval of PBR & packer
12. De-completion : Retrieve PBR & Packer
11. Decompletion steps
11. De-completion steps
10 . De-completion procedures
10. De-completion procedures
9 . TCA & CCA leak reasons
9. Leak in TCA & CCA
8. Check Tubing Casing Annulus (TCA) & CCA integrity
8. Check Tubing Casing Annulus (TCA) & CCA integrity
7. Requirements for De-completion
7. Requirements for De completion
6. Old well : Well site preparation
6. Old well: well site preparation
5. Difference between old well & new well in workover