Polymerman Boatbuilding
Polymerman Boatbuilding is a wooden boat building channel from the Minnesota in the United States of America. Bob Kody details the construction of the 24 foot mahogany runabout, Temptress, which is kitted by Dan Lee Boat Building in the UK. Rather that using a CNC machine, the boat bulkheads, gussets and frames are cut using the Shaper Origin tool.
Playlists:
Wooden Boat Build: A series of videos documenting the modern cold molded wood boat building process. The boat is a wooden mahogany runabout "Temptress" kitted by Dan Lee Boat Building. The Shaper Origin CNC router is used to cut out the boat frames.
@DanLeeBoatbuilding.
Cook's Animated is meant to be a fun cooking cartoon, made by kids. We hope that both kids and 'kids at heart' enjoy our recipes and taste tests.
Boat Builders Travels: A comical and entertaining documentation of one mans travel and visions of boat building in each location.
Temptress Build 72: Into the New Workshop
Temptress Build 71: Out of Storage to a New Home
Temptress Build 70: Lifting and Moving The Boat To Storage
Temptress Build 69: Reinforcing the Structure
Temptress Build: Year 2
Temptress Build 68: Port Topside Battens
Temptress Build 67: Starboard Topside Battens (Frame Notching)
Fastest Method to Install TopSide Battens
Temptress Build 66: Upper Topside Batten Port Side - Full Thickness
Temptress Build 65: Upper Topside Batten Starboard Side
Temptress Build 64: 7-Hour Starboard Sheer Clamp Installation
Temptress Build 63: Shaping and Bonding the Sheer Clamp
Temptress Build 62: Forming The Sheer Clamp To The Boat
Temptress Build 61: Finally... CNC Shaped Sheer Clamps
Temptress Build 60: 5 Hour Installation of Port Side Batten
Temptress Build 59: 1st Topside Batten
Temptress Build 58: A Quick Update
Temptress Build 57: Rethinking the Sheer Clamp
Temptress Build 56: Halloween Frame Fairing 2024
Temptress Build 55: Starboard Sheer Clamp (part 1)
Temptress Build 54: Limber Holes
Temptress Build 53: Port Chine Bottom Rail
Temptress Build 52: Starboard Chine Bottom Rail
Temptress Build 51: Completing the Chines
Temptress Build 50: Installing the 1st Chine Laminate
Temptress Build 49: Installing the Chine Top Rails
Temptress Build 48: Chine Top Rail Notches
Temptress Build 47: Profiling the Stem
Temptress Build 46: Shaping the Keel
Temptress Build 45: Shaping the Stringers