MIT INDUSTRIES LLC
A Channel about an Electrical Engineer doing normal stuff.
79 CHEVY C20 CAB PREP AND EPOXY PRIMED FOR PATINA PAINT…
UP THE RIVER WITHOUT A PADDLE!!! but I found a chancla...
HOW I BUILD A 1/24 SCALE MODEL TRUCK. UNSING BAMBU LAB A1 3D PRINTER.
66 INTERNATIONAL BRAKE BOOSTER AND MASTER CYLINDER INSTALL.
WORKING ON THE 1966 INTERNATIONAL 1100 STEERING COLUMN, AND ORIGINAL DASH.
STARTING TO WORK ON THE 1966 INTERNATIONAL C1100.
POWER ANALYSIS FOR A DELTA CONNECTED LOAD
SOLVING FOR TOTAL HARMONIC DISTORTION
MOVING THE INTERNATIONAL C1100 INTO THE SHOP
CHARGING THE A/C SYSTEM! A/C BUILD MOMENT OF TRUTH!!
HOW I PATINA PAINTED THE BED OF THE CHEVY C20
FOOTHILLS CRUISE-IN MARYVILLE, TN 2025
SHAY'S 1966 INTERNATIONAL 1100
BUILDING A SOLID CHEVY 14 BOLT REAR END WITH EATON DETROIT TRUETRAC.
SHAY'S FIRST DRIVE IN THE 79 CHEVY
AEROSPACE COMPONENTS VACUUM SYSTEM INSTALLED ON THE 79 C20
THREE PHASE FULL WAVE RECTIFIER VDC OUT.
SINGLE PHASE FULL WAVE RECTIFIER VDC OUT.
SINGLE PHASE HALF WAVE RECTIFIER VDC OUT.
AEROSPACE COMPONENTS VACUUM PUMP KIT
TRANSFORMER EFFICIENCY
FIND POWER LOAD LOSS - TRANSFORMER WORD PROBLEM.
CHRISTMAS DRIVE 2024..
THE BEGINNING OF THE 1993 CHEVY BLAZER BUILD
REMOVE OIL VAPOR AND FUMES FROM YOUR ENGINE BAY..
BUILDING CUSTOM A/C HOSES FROM VINTAGE AIR.
NEW VINTAGE USA INSTRUMENT PANEL INSTALLED IN THE 79
VINTAGE AIR CUSTOM HARD LINES PART 3, CAB UNIT