Techno Saju
This is an educational channel. This Channel will provide all kind of Electrical Engineering and technical related videos for all viewers.
One Way Electrical Switch Board Fully Explained With Specifications ||
Electrical Cable From PCC Pole To House ||
11 KV 4- Way RMU Cable Termination Process ||
33 KV Manually Operated Isolator With Cut Pole ||
11 KV Cable Drum Lifting With JCB ||
11 KV Manually Operated Isolator ||
3 - Phase Metering Chamber With CT And PT ||
3 - Phase Meter Connection With Isolator ||
11 KV 5 -Way RMU Ring Main Unit ||
11 KV Ring Main Unit RMU ||
11 KV RMU Foundation Making ||
Water Pouring From 33 KV Cable ||
33/11 KV Switchyard Sub Station ||
11 KV Overhead Lines Cradle Guarding Process || Part - 2
11 KV Electrical Overhead Lines Cradle Guarding Process || Part - 1
33 KV Overhead Isolator Connection ||
33/11 KV Electrical Sub Station ||
33 KV Potential Transformer PT ||
Electrical Control Cable Pulling With Skillful Manpower ||
HDD Horizontal Directional Drilling For 33 KV Cable Pulling ||
Electrical Optical Fibre Cable Opening From Wooden Drum ||
33 KV 3Cx400 SQMM Cable Bending With Ring Making ||
33 KV Cable Drum Handling With Hydra ||
33 KV Under ground Cable Pulling With HDD Process ||
11 KV Overhead Lines Dropper Making With Al Dog Conductor ||
33 kV Chair Structure With Load Break Switch Connection ||
33 KV 3Cx400 SQMM Cable Straight Through Joint Full Process || Part - 3
33 KV 3Cx400 SQMM Cable Straight Through Joint Full Process || Part - 2
33 KV 3Cx400 SQMM Cable Straight Through Joint Full Process || Part - 1
33 KV Isolator With STP Cut Pole ||