Block 8 Tanjong Pagar Plaza - FUJITEC elevators
Автор: tswub
Загружено: 2025-09-19
Просмотров: 884
Similar to the slightly shorter blocks around it (eg. Block 5), this HDB block was completed in 1977.
Its original lifts were most likely also modernised under the Interim Upgrading Programme (IUP) - Batch 1, between 1994 and 1996.
It is not known whether the lifts were one-door or two-door after getting modernised.
However, they most certainly did not serve every storey (1 to 27).
Therefore, they were upgraded again under the Town Council Lift Upgrading Programme (TC-LUP) - Batch T02, where residents need not pay for the lift replacement.
The Lift Upgrading Programme officially completed on 26 September 2009.
(0:00) Introduction
Location: 8 Tanjong Pagar Plaza, Singapore 080008
Date: 13 April 2025, Sunday
Time: 1339hrs to 1342hrs
Camera: Samsung Galaxy S21 Ultra 5G phone
(0:26) Lift A
(1:27) At Storey 27
(1:57) Lift B
Each lift has a capacity of 10persons/680kg.
Both lifts serve Storeys 1 to 27.
Both lifts have faint announcements.
Tags:
Block 8 Tanjong Pagar Residential HDB - Fujitec traction elevators
#Fujitec #hdbelevator #elevator #elevators
Thanks for watching!
Have a pleasant day, evening or night ahead!
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: