Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
dTub
Скачать

Full Upgrade Process; Gateless to Gated | Belgrave-Gembrook Road Level Crossing, Gembrook

Автор: Ethan The Victorian Railfan!

Загружено: 2024-06-07

Просмотров: 1791

Описание:

Hey guys!
On Monday the 13th May 2024, the gateless level crossing at Belgrave-Gembrook Road in Gembrook was scheduled to have brand new gated signals installed, adding another gated crossing to the line.
This meant the old signals would be removed while new ones put together and installed, tested and commissioned all on the one day.

Making my way from Wallan early in the morning I got to Gembrook at about 9:25, and they had already taken off the signage and lights on the bell signal. It wasnt long after when the V/Line truck arrived carrying the new level crossing equipment, and then it all started happening.

As nobody really reads the descriptions, I'll write the key events rather than descriptive paragraphs.

They started by unloading majority of the smaller equipment from the truck, gates, lights, signs. Following that, the V/Line crew prepared the crane on the back of the truck to remove the old bell signal, lying it down on the ground. They then craned off the new signal poles, and put the old bell signal onto the truck. While this was happening, the new signage, bell, and lights were being attached to the new pole.
The signal was then craned into the air and onto the base, shaping the first 3rd of the upgrade. The gate mechanism followed that, being craned onto the pole ready for wiring.
The next major point of interest was the gateless signal being fitted with its equipment and craned up into the air onto its base. While this happened the other gated signal was fitted with equipment, and light testing was carried out too.
After that, the old southern gateless signal was removed and craned onto the truck. They then began the precarious task of lifting the new signal onto its base without hitting the tree. Which was done perfectly.
The gate mechanism was installed, wired up and fitted the same as the previous.
A few minor tests of the gates followed, before they began to pack up with the accomplishment of the day completed.

Thanks to all the friendly crew at V/Line who were there as well as the few Puffing Billy staff onsite as well. I'm grateful for the conversations I had with a few of the crew, as it made the day even better!
Meeting the man who designed the massive crossing at Menzies Creek as well was an honour. Truely magnificent crossing!

Timestamps:
0:00 Quick shot of the last activation of the gateless signals (credit ‪@TazzieTransport‬)
0:10 Quick shot of first full test of gated signals
0:21 (09;31AM) Equipment filled V/Line truck arrives.
0:38 (09;38AM) Unloading truck
1:28 (10;04AM) Removing the old bell signal & pulling new poles off truck
4:31 (10;29AM) The new WCH M bell
4:50 (10;31AM) Old bell signal placed on truck
5:50 (10;57AM) Quick update
6:18 (11;32AM) Quick update #2
6:50 (11;51AM) Installing the new northern signal on its base
8:36 Northern Signal Gate Mechanism Installation
11:45 First Light Testing (Northern Signal
13:00 Second Light Testing (South-eastern Signal)
13:35 Third Light Testing (Eastern Signal)
14:31 Uprighting the gateless signal
17:28 Removing the old southern signal
17:56 ...and putting it on the truck
18:40 Uprighting the southern signal
21:13 Southern signal gate mechanism installation
22:44 PBR ute with some of the old equipment
22:52 And the V/Line truck with the poles
23:13 Northern side gate installation
24:19 Counterweight installation
25:52 First powered lowering test
26:20 First bell test
26:48 First under-power raising test
27:09 Southern side gate installation
28:00 Testing with lights, plus lowering & rising gate
28:26 First full crossing test
29:04 Crossing test again for photos & final checks
29:43 Outro (ig?)

Thank you for watching and reading (if you did!)
-Ethan

#railway #steam #trains #puffingbilly #heritage #light #trending #melbourne #steamtrain #gate

Full Upgrade Process; Gateless to Gated | Belgrave-Gembrook Road Level Crossing, Gembrook

Поделиться в:

Доступные форматы для скачивания:

Скачать видео mp4

  • Информация по загрузке:

Скачать аудио mp3

Похожие видео

Belgrave-Gembrook Rd/Main St Level Crossing, Gembrook (Before & After Upgrade)

Belgrave-Gembrook Rd/Main St Level Crossing, Gembrook (Before & After Upgrade)

Power pole change out-2

Power pole change out-2

Президент выводит войска? / Спецборт срочно вылетел в Москву

Президент выводит войска? / Спецборт срочно вылетел в Москву

Townsville Waste with HT30612

Townsville Waste with HT30612

Power pole change out-1

Power pole change out-1

*WCH E Bells & Full Crossing Upgrade* Birkett Street Level Crossing, Euroa, Victoria, After Upgrade

*WCH E Bells & Full Crossing Upgrade* Birkett Street Level Crossing, Euroa, Victoria, After Upgrade

24/7 Live Luxury Ambient Mix | Chillout Sunset Lounge Music for Deep Relaxation

24/7 Live Luxury Ambient Mix | Chillout Sunset Lounge Music for Deep Relaxation

Great New Landfill Use SHANTUI Dozer C3& Many Dump Truck Unloading Stone Back Fill Sink Land

Great New Landfill Use SHANTUI Dozer C3& Many Dump Truck Unloading Stone Back Fill Sink Land

ЛИПСИЦ: Кризис ТОТАЛЬНЫЙ. Минфин горит. Нефть Путина никому не нужна. Цены растут. Трамп. Банки

ЛИПСИЦ: Кризис ТОТАЛЬНЫЙ. Минфин горит. Нефть Путина никому не нужна. Цены растут. Трамп. Банки

Calm Winter Lakeside Porch Ambience ❄️🔥 Crackling Fire Pit, Piano Music & Snow Sounds to Relax

Calm Winter Lakeside Porch Ambience ❄️🔥 Crackling Fire Pit, Piano Music & Snow Sounds to Relax

ARTC Setup | Intermodal Way Level Crossing, Port Melbourne, Victoria

ARTC Setup | Intermodal Way Level Crossing, Port Melbourne, Victoria

Finest Project Initiative Lowest Land Distant In The Deleting of Creating Using Shantui Dozer & 25TT

Finest Project Initiative Lowest Land Distant In The Deleting of Creating Using Shantui Dozer & 25TT

SUPER RARE SHOTS OF BCRY 1001 WITH 19 CARS, AND CROSSING THE CP RAIL DIAMOND!!!

SUPER RARE SHOTS OF BCRY 1001 WITH 19 CARS, AND CROSSING THE CP RAIL DIAMOND!!!

«Мы хотим этот кусочек льда»: Трамп выступил о Гренландии на форуме в Давосе

«Мы хотим этот кусочек льда»: Трамп выступил о Гренландии на форуме в Давосе

Level Crossing, Clarendon NSW, Australia.

Level Crossing, Clarendon NSW, Australia.

Snow Falling Piano Music by the River ❄️ Cozy Winter Porch Campfire & Snow Sounds Ambience

Snow Falling Piano Music by the River ❄️ Cozy Winter Porch Campfire & Snow Sounds Ambience

TRAIN DRIVER'S VIEW: Nice winter day on the Flåm Line in 4K UltraHD

TRAIN DRIVER'S VIEW: Nice winter day on the Flåm Line in 4K UltraHD

ENR Full automatic Level crossing prototype

ENR Full automatic Level crossing prototype

Chasing Union Pacific Big Boy No. 4014 Steam Train Over Donner Pass (July 14, 2024)

Chasing Union Pacific Big Boy No. 4014 Steam Train Over Donner Pass (July 14, 2024)

Before & After Upgrade | You Yangs Road, Little River, Victoria

Before & After Upgrade | You Yangs Road, Little River, Victoria

© 2025 dtub. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: infodtube@gmail.com