Concrete Slab for Sawmill: Prep, Form and Pour
Автор: The Leavers Family
Загружено: 2020-06-12
Просмотров: 1021
In this video, I get the rest of the concrete in place for the sawmill/ kiln/ backhoe shelter. First, I install a french drain around the kiln. I also buried some drain pipes for the gutters. After back filling, I made some forms for a 6 inch thick slab with a 1/2" rebar grid at 24" on center. I poured a full truck (9 yards) into the forms and with some help from the family, got it smoothed out and looking pretty decent. Thanks for watching!
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: