Navi Mumbai Airport Opens December 25 |✈️ Complete Access Guide (2025)
Автор: Sky Shots
Загружено: 2025-11-24
Просмотров: 23867
Navi Mumbai International Airport officially opens on 25 December 2025, and the first IndiGo flight will land at 8 AM.
This video gives you the complete connectivity guide — how to reach the new airport from Mumbai, Thane, Navi Mumbai, Panvel, Pune and beyond.
00:00 Disclaimer
00:01 First Flight on 25 December 2025
00:25 Airport Features & Phase 1 Cost
00:55 Greenfield Project Overview (2800 Acres)
01:20 Cargo Capacity & Lotus Terminal by Zaha Hadid
01:50 Why This Airport Is Easy to Reach
02:12 Atal Setu Connectivity
02:37 Ulwe Coastal Road
03:25 Airport Link Road (Part of UCR)
03:51 Western Entry Interchange
04:51 Eastern Side Access (Kharghar CBD–Belapur Coastal Road)
05:31 Highway Connectivity & Approx Travel Times
06:03 Metro Connectivity (Line 1 & Line 8 – Gold Line)
07:00 Panvel Rail Hub
07:19 Airport Shuttle Services
08:03 Water Taxi from Gateway of India
08:25 Airport Sustainability Features
08:51 Complete Summary & Closing
In this video, we break down every major route with real drone visuals:
🚗 ROAD CONNECTIVITY (2025–2026)
● Atal Setu → Airport: 35–40 minutes
● Ulwe Coastal Road: High-speed signal-free corridor (80% complete)
● Aamra Marg / NH-348
● Sion–Panvel Highway
● Palm Beach Road
● Thane–Belapur Road
● Mumbai–Pune Expressway
🚇 METRO CONNECTIVITY
● Navi Mumbai Metro Line-1 (Belapur–Pendhar) – future extension to airport planned
● Mumbai Metro Line-8 (Gold Line):
• India's first Airport-to-Airport Express line
• CSMIA → Navi Mumbai Airport in just 30 minutes
• 35 km | 20 stations (14 elevated + 6 underground)
🚆 RAIL CONNECTIVITY
● Panvel → NMIA: Major rail hub
● Panvel–Karjat Fourth Line: December 2025
● Future direct access from Pune region
● Targhar Station → Airport Shuttle (planned)
🛥️ WATER TAXI (India’s FIRST Sea-Connected Airport)
● Gateway of India → NMIA via Electric Water Taxi
● Approx travel time: 40 minutes
● Zero traffic, fastest sea route
🌿 SUSTAINABILITY (Green Airport City)
● Designed for 47 MW Solar Power
● Rainwater harvesting systems
● Wastewater recycling
● EV ground transport + future APM network
✨ NMIA Facts at a Glance
✔ Cost (Phase 1): ₹19,650 crore
✔ Passenger Capacity: 20 lakh per year (Phase 1) → 90 lakh per year (future)
✔ Designer: Zaha Hadid Architects
✔ Spread across 1,160 hectares
✔ Multi-Modal: Road + Rail + Metro + Sea
📢 Subscribe for more real drone visuals
We bring you clean, authentic, real-footage explainers on India’s biggest infrastructure projects.
Subscribe to support our work and stay updated with India’s transformation.
⚠️ Disclaimer
Information is based on publicly available sources as of November 2025. Timelines, project details and travel estimates may change as per official updates. This video is independently produced and not affiliated with CIDCO or NMIA authorities.
#NaviMumbaiAirport #NMIA #AtalSetu #MumbaiAirport #IndiaInfrastructure #MumbaiMetro #AirportConnectivity #MumbaiNews #aviationindia
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: