Sugarbush: Super Bravo Express
Автор: Collin Parsons
Загружено: 2019-12-07
Просмотров: 1728
This Doppelmayr detachable quad was one of many new lifts built at Sugarbush in 1995. It's the main lift out of the Lincoln Peak base, and replaced a Poma triple which was relocated to become North Lynx.
The length is 5689 feet and vertical is 1529 feet. The speed during this recording is about 950 fpm. The design capacity is 2800/hr at 1000 fpm, but I think it only has enough chairs from 2400.
This was my favorite lift of the ones open today because it's fast and serves a lot of great terrain right out of the base. Although it runs high hours, I think as long as it's reliable it does not need replacement. Capacity is not an issue since it has backup from the Valley House Quad.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: