Aft Fuselage pt3 Building a Vans RV 14 Airplane Ep13
Автор: Blue Sky Flight
Загружено: 21 янв. 2025 г.
Просмотров: 1 002 просмотра
This episode of the Vans RV-14 airplane build continues construction of the Aft Fuselage section of the aircraft. It picks up with riveting the bottom skin to the main bulkheads, and continues with attaching the side skins, as well as the aft bulkheads and aft bottom skin.
This is part 13 of the video series following me building an airplane from a kit produced by the #vansaircraft company.
Watch all videos in the complete Vans RV-14 Airplane Building series: • Building an Airplane
Also, Watch the Complete Piper Arrow Aircraft Restoration Video Series:
• PA-28 Piper Arrow Renovations and Upg...
Watch the Oshkosh 2023 Videos here:
• Oshkosh EAA Airventure
Please hit the SUBSCRIBE Button (or the link below) to watch all of our Piper Arrow II aircraft restoration videos, flight adventures, and upcoming videos!
/ @blueskyflight

Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: