DO 70 s2016 Subbase and Base Course 200mm compaction
Автор: Engineering Civil Integrity
Загружено: 2022-03-05
Просмотров: 4234
Materials Engineer Accreditation -
This is to provide reference for Department of Public Works and Highways' (DPWH)
requirement to ensure that all qualified and competent materials engineers will
be assigned by the contractors and consultants.
About the Channel
This channel is intended to give information and ideas to construction consultants, contractors,
civil engineers, materials engineer, project engineers, construction project supervisors and everyone in the construction industry.
What is the maximum compacted thickness per layer for Aggregate Subbase and Base Course (Item 200 and Item 201)?
a) 125 mm
b) 150 mm
c) 200 mm
d) 250 mm
Answer: c) 200 mm
Reference: DO_070_S2016 https://www.dpwh.gov.ph/DPWH/sites/de...
Department Order No. 70 Series of 2016
Subject: Adoption of Compacted Thickness of 200 mm in Item 200 - Aggregate Subbase Course and
Item 201 Aggregate Base Course in Concrete and Asphalt Paving Works of National Roads.
In order to ensure the efficient utilization of equipment and manpower resources in the implementation of various DPWH infrastructure
projects, the existing standard specifications of the above-mentioned Items need to be improved/modified.
Paragraph 2 of Subsection 200.3.3 (Spreading and Compacting) of the DPWH Standard Specification for Highways, Bridges and Airports, Volume
II, 2012 Edition (Blue Book), state that: "...Where the required thickness is more than 150 mm, the aggregate subbase shall be spread and compacted in two or more layers of approximately equal thickness, and the maximum compacted thickness of any layer shall not exceed 150 mm."
However, due to the advancements in construction technology wherein compaction equipment of higher compactive effort is already available and in order to optimize time and effort during road construction, said provision needs to be revised and modified accordingly.
Henceforth, it is hereby prescribed that the maximum compacted thickness per layer for both aggregate subbase and basecourse (Item 200 and Item 201 of the Blue Book, respectively) shall now be 200 mm, to be spread and compacted in one layer using vibratory roller equipment with at least ten (10) metric tons capacity, until the required field (in-situ) density of at least 100% of the prescribed maximum dry density is attained. Other provisions of the said Items of Works remain the same and
shall be strictly followed. Test requirement on these items shall be based on the approved revised Minimum Testing Requirements (MTR).
This Order shall take effect immediately.
ROGELIO L. SINGSON
SECRETARY
Materials Engineer Reviewer
Project Engineer Reviewer
Department of Public Works and Highways
DPWH Department Orders
Civil Engineer
Materials Engineer
Project Engineer
Roads and Bridges
Earthworks
Dams
Item 200 Aggregate Subbase
Item 201 Aggregate Base Course
Maximum Thickness per layer = 200 mm
Minimum Weight Capacity of Vibratory Roller = 10 metric tons