Today we remove the wheelhouse frames for finishing in our workshop. The plan initially was to finish the construction of the wheelhouse on board but the weather plays such a big factor in what can be done there. So as the finished boat cannot be transported by road if the wheelhouse is fixed, due to height restrictions to go under bridges etc. So the plan is to nearly finish in the workshop, then do a trial fit on board. When all of it is deemed to be satisfactory, it will be removed and finally fitted when the boat is in the water. We will hire a 60 foot low loader so it will be transported on the rear, behind the boat to overcome the height problems. Then whilst we have the crane for lifting Wearmouth into the water, the wheelhouse can be lifted on board to do the final fit at that time.
Work is progressing slowly, but then we are all volunteers mostly retired of pension age and above, generally working between one and three 4-5 hour days per week.
The content of this video was recorded on 12th November 2025. Cameras and drone were Nick Simpson and Keith Holman, footage edited by Keith Holman.
This is a charity run 100% by volunteers with the aim of preserving our local maritime heritage.
Patreon “please follow this link if you’d like to support us”
/ sunderlandmaritimeheritage
We are at Unit 2, Church Street East, Sunderland SR1 2BB
Our Opening Hours are:
Monday, Wednesday & Friday 10.00 – 14.00 or by appointment.
Contact details: [email protected] or Tel. 0191 510 2540
For donations, see our website below where all are gratefully accepted.
Our website:
www.sunderlandmaritimeheritage.org.uk I volunteer for SMH, some videos from this channel may also be seen on my channel as my aim is to spread the word about our charity as wide as possible: / @keithklivideo "
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: