Why India Built a 320 km/h Bullet Train (Mumbai to Ahmedabad)
Автор: BeyondTheBuild
Загружено: 2026-01-23
Просмотров: 77
India is officially stepping into the high-speed rail era.
The government has confirmed that India’s first bullet train will launch on August 15, 2027, aligning the debut with Independence Day — a symbolic moment in the nation’s infrastructure history.
The first operational section will open on the Mumbai–Ahmedabad High-Speed Rail Corridor, starting with the Surat–Bilimora stretch in Gujarat.
Phased openings will allow rigorous safety testing, crew training, and system validation before full operations begin.
Powered by Japanese Shinkansen technology, the project promises:
🚄 Dramatically shorter travel times
🛡️ World-class safety and earthquake resilience
📈 Regional growth and economic integration
🎓 Global engineering standards backed by Indian institutes
In this video, we explore:
Why August 15, 2027 matters
How Shinkansen tech is being adapted for India
What the first bullet train route will look like
Why this project could reshape Indian transport forever
This isn’t just a new train.
It’s India’s arrival into the world of true high-speed rail.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: