New storm tanks created at Ambleside and Windermere works to help improve water quality
Автор: United Utilities
Загружено: 2025-02-14
Просмотров: 436
We've created additional storage at two of its sites around Windermere to help improve water quality.
The company has repurposed tanks at its Ambleside and Windermere wastewater treatment works to create an additional 2.6 million litres of storage across the two sites – the equivalent of around 33,000 bathtubs or just over an Olympic size swimming pool!
As a result of upgrades at both sites, the tanks were redundant and able to be repurposed into storm tanks after the installation of some new equipment. The additional storage will help increase the amount of storm water the sites can store and then return for full treatment, reducing the number of times the storm overflows need to operate during periods of heavy rainfall.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: