Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
dTub
Скачать

Monster Concrete Pour: 300 Yards in Mere Hours!

Автор: Bast Hatfield Construction

Загружено: 2025-05-03

Просмотров: 481

Описание:

Massive 300-Cubic-Yard Concrete Pour by Bast Hatfield Marks Milestone in Troy, NY Luxury Apartment Project

Bast Hatfield Construction, a leading self-performing general contractor based in New York's Capital Region, has completed a significant 300-cubic-yard concrete pour in downtown Troy, NY. This milestone marks a major step in the construction of a new luxury apartment complex overlooking the Hudson River. The project is being developed by The BDC Group, a respected real estate and construction management firm headquartered in Latham, NY.

Foundation for Riverfront Living

Situated on Troy's vibrant and historic riverfront, this multi-family residential project blends upscale urban living with sustainable construction. The large-scale concrete pour, carried out by Bast Hatfield's in-house crews, forms the structural foundation for a building that will offer sweeping river views and proximity to Troy's thriving downtown scene.

Self-Performed Expertise in Action

As a self-performing contractor, Bast Hatfield handled BHC concrete foundations & flatwork, metal stud framing, siding, and brick veneer. Their ability to self-perform key trades like concrete ensures tight quality control, schedule reliability, and cost efficiency. The pour required detailed planning and execution using high-strength, ready-mix concrete from a local supplier, applied in a continuous flow for optimal curing and strength.

Project Highlights

Volume: 300 cubic yards of ready-mix concrete

Location: Hudson Riverfront, Troy, NY

Project Type: Luxury apartment building

Client: The BDC Group

General Contractor: Bast Hatfield Construction (Self-performing)

Application: Foundation slab, elevator shaft base, and core walls

Logistics: Coordinated deliveries with minimal local disruption

Conditions: Completed on schedule during winter weather

The pour included foundational and vertical components such as the elevator shaft and lower-level slab.

A Vision of Modern Living

Upon completion, the building will offer high-end amenities, open layouts, premium finishes, and windows that frame the Hudson River. The project adds momentum to Troy's ongoing waterfront revitalization, attracting new residents and economic activity.

Its location provides quick access to Albany, RPI, and major transportation routes, appealing to professionals, families, and students seeking a walkable, urban lifestyle. Sustainability is a core feature of the project, with environmentally friendly materials, energy-efficient systems, and landscaped communal areas incorporated into the design.

A Strong Regional Partnership

The partnership between Bast Hatfield and The BDC Group highlights the value of local expertise. Bast Hatfield's ability to self-perform critical scopes and manage complex logistics allows the team to maintain quality, meet tight deadlines, and bring the client's architectural vision to life.

The BDC Group's selection of Bast Hatfield reflects confidence in their capability to deliver premium results on time and on budget, based on a shared history of successful commercial and residential developments throughout upstate New York.

Commitment to Safety and Sustainability

Executing a pour of this magnitude demands top-tier safety standards. Bast Hatfield employed a site-specific safety plan, comprehensive equipment checks, and trained personnel to ensure a safe and efficient operation. The company also prioritized environmental responsibility to meet both performance and sustainability targets.

Next Phase: Vertical Construction

With the foundational concrete work complete, the project moves into its vertical construction and framing phase. Bast Hatfield will continue to self-perform key scopes while coordinating subcontractors to maintain progress and uphold quality benchmarks.

This new riverfront apartment complex represents more than just new housing-it's a symbol of modern construction, smart collaboration, and regional growth. As the structure rises, it stands as a testament to the strength, precision, and professionalism of Bast Hatfield Construction.

#concrete #generalcontractor #newconstruction

Monster Concrete Pour: 300 Yards in Mere Hours!

Поделиться в:

Доступные форматы для скачивания:

Скачать видео mp4

  • Информация по загрузке:

Скачать аудио mp3

Похожие видео

Хаос при заливке лестницы: один промах, один потерянный инструмент, всё тот ​​же отличный бетон

Хаос при заливке лестницы: один промах, один потерянный инструмент, всё тот ​​же отличный бетон

Watch This Master Bricklayer Build a Perfect Wall in Minutes!

Watch This Master Bricklayer Build a Perfect Wall in Minutes!

exquisite surface space in the deep pit is being road construction using dump truck and bulldozer

exquisite surface space in the deep pit is being road construction using dump truck and bulldozer

Как GEELY захватила мировой автопром | История успеха

Как GEELY захватила мировой автопром | История успеха

How Do You Lay THIS Brick Corner? One Brick from Disaster

How Do You Lay THIS Brick Corner? One Brick from Disaster

Top 6 Incredible Old To New Manufacturing & Recycling Process In Giant Factoreis

Top 6 Incredible Old To New Manufacturing & Recycling Process In Giant Factoreis

СТРОИТЕЛЬНЫЕ ТЕХНОЛОГИИ НОВОГО УРОВНЯ

СТРОИТЕЛЬНЫЕ ТЕХНОЛОГИИ НОВОГО УРОВНЯ

Немедленный приказ Зеленского / МИД бьёт тревогу

Немедленный приказ Зеленского / МИД бьёт тревогу

Массивная заливка бетона | Цех площадью 300 ярдов за 12 часов

Массивная заливка бетона | Цех площадью 300 ярдов за 12 часов

Для Чего РЕАЛЬНО Нужен был ГОРБ Boeing 747?

Для Чего РЕАЛЬНО Нужен был ГОРБ Boeing 747?

Видишь эти признаки? Значит дом лучше не покупать.

Видишь эти признаки? Значит дом лучше не покупать.

Complete Construction of a Modern Getaway Home

Complete Construction of a Modern Getaway Home

30 Minutes Of Amazing Continuous Production Machinery & Most Admirable Worker Ever Before ▶31

30 Minutes Of Amazing Continuous Production Machinery & Most Admirable Worker Ever Before ▶31

EXCAVATOR POWER: Breaking a Hill like a Pro!” #excavators #stonemachinery #jcb #mining #drilling

EXCAVATOR POWER: Breaking a Hill like a Pro!” #excavators #stonemachinery #jcb #mining #drilling

Кто победит в заезде: самый быстрый Koenigsegg против самого быстрого Bugatti?

Кто победит в заезде: самый быстрый Koenigsegg против самого быстрого Bugatti?

Строительные материалы на улице . Как и Сколько можно хранить ?

Строительные материалы на улице . Как и Сколько можно хранить ?

Куда исчезли ТРЕХФАЗНЫЕ ПОЕЗДА? История электротранспорта о которой вы не знали!

Куда исчезли ТРЕХФАЗНЫЕ ПОЕЗДА? История электротранспорта о которой вы не знали!

Фейлы тяжёлой техники и промышленные аварии, снятые на камеру 😱🚜⚠️

Фейлы тяжёлой техники и промышленные аварии, снятые на камеру 😱🚜⚠️

Подводные сооружения | Как инженеры их делают?

Подводные сооружения | Как инженеры их делают?

Net Zero Ready Crawlspace Floor Framing

Net Zero Ready Crawlspace Floor Framing

© 2025 dtub. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: infodtube@gmail.com