Completely REFINISHING My Transom Assembly: Pt 5 - Continuity Kits and Final Bits
Автор: A Ship Show
Загружено: 2025-11-28
Просмотров: 188
Welcome back to the final episode in my series on a complete rehab of my Bravo transom assembly! In this episode I finally wrap up the final parts of the puzzle to complete the job. I start off with completing the lower shift cable adjustment, then move on to installing the hydraulic steering cylinder. Then its on to reinstalling the exhaust Y pipe before hopping back outside and dealing with the continuity kit which required drilling new holes in place of all of the broken screws. The final piece of the puzzle is getting the new trim senders installed in the gimbal ring.
Its been a long journey, but I can finally say the transom assembly is complete!
I hope you all found this series helpful and not too cringy!
Thanks again for watching!
Parts I used:
Continuity Kit:
https://www.mercruiserparts.com/99940...
Y Pipe Gasket:
https://www.mercruiserparts.com/41802...
Shift Cable Adjustment Tool:
https://powerboatsupply.com/uncategor...
Trim Sender Kit (3 wire sender for SmartCraft system):
https://powerboatsupply.com/uncategor...
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: