New Compressor Installation Design Tech Transfer

Автор: Tech Transfer Inc

Загружено: 2015-10-26

Просмотров: 9328

Описание:

Visit http://www.techtran-hou.com/ or Call 713-462-3636

Tech Transfer has the ability to design COMPLETE reciprocating compressor installations; including the compressor package. In this case, the scope of the design included the structural steel skid, pressure vessels , bottles, the piping system, along with the coolers and its supports. It even includes the concrete foundations.

All of the necessary analyses were included: structural, torsional, acoustical, plus piping stress and dynamics. We also analyzed the foundation stresses and vibration levels .

The complete design included P and IDs, plot plans and general arrangement drawings. Tech Transfer provided all fabrication drawings including bills of material along with welding details for each fabricated component. Pipe support and pipe clamp details were also provided. The technical design package created by Tech Transfer contained more than 200 detailed drawings, even down to the foundation bolt specification.

Notice from this “3-D Package Model”, the scrubbers and process gas piping are structurally separated from the main equipment skid. Separating the mechanical and acoustical energy sources significantly reduced vibration. We refer to this as our Hybrid Foundation concept.

The main skid supports the engine and compressor along with the utilities. The design and robust construction, of the red primered skid shown here, provides specific paths to direct the mechanical energy through the skid and into the foundation. The acoustic solution integrates the scrubbers, cylinders, bottles, process piping and coolers. Properly sized and strategically placed pipe supports ensure lower vibration of the piping system.

During the foundation design, we specified additional reinforcement steel to transmit and dissipate the energy from the unbalanced forces. The Additional steel significantly reduced cracking in the high stress areas of the main foundation. We performed a dynamic analysis of the skid and equipment to confirm natural frequencies and high vibration would not become a problem.

The side skids were shipped with the piping and valves completely assembled. The side skids were completely covered with galvanized steel grating, and stairs. The grated floor creates a safe working environment for operations and maintenance personnel.

The interconnecting piping between the equipment skid and the cooler, was assembled, tested and shipped on its own structural skid, further eliminating construction time and costs.


Benefits of a Modular Design

Before you even issue your RFQ, our designed and engineered packages will ensure the overall success of your project. From purchasing to the field installation and start up, our “modularized” design works best in so many ways.

The entire package can be assembled and tested as components in the shop to verify system integrity and prevent field fit-up problems. This modular approach completely eliminates field piping fabrication and testing.

Your compressor package layout and installation will be designed to meet your technical requirements and operational needs.

Saving time saves money and we’ve seen six to eight WEEKS of time savings first hand! Quicker startup and earlier operation translates to increased revenue and higher profits.


We are always ready to discuss your field vibration problems. And- as you have seen-, we’re ready to design and engineer your new compressor packages as well. We have over 50 new compressor packages in the field. We’re ready when you are. Remember- at Tech Transfer, Our RESULTS are YOUR Solution.

If your may be considering a new compressor package installation, we would like to speak to you. We're confident we can help.
Please contact:

Tim Timmerman
Office: 713-462-3636
Cell: 713-906-0166
E-mail: tim.timmerman@techtran-hou.com

New Compressor Installation Design   Tech Transfer

Поделиться в:

Доступные форматы для скачивания:

Скачать видео mp4

  • Информация по загрузке:

Скачать аудио mp3

Похожие видео

Extreme Pressure Turns Wood Into OSB Board | Inside the Factory

Extreme Pressure Turns Wood Into OSB Board | Inside the Factory

The BIGGEST Concrete Pump at World of Concrete 2026 Las Vegas!!!

The BIGGEST Concrete Pump at World of Concrete 2026 Las Vegas!!!

В Пакистане пакистанец изготавливает высококачественные деревянные тележки в своей мастерской

В Пакистане пакистанец изготавливает высококачественные деревянные тележки в своей мастерской

Heat Exchanger Integrated Services (HEXIS) | Amerapex

Heat Exchanger Integrated Services (HEXIS) | Amerapex

Vibration Analysis and Modification Design   Tech Transfer

Vibration Analysis and Modification Design Tech Transfer

Проблема радиоактивной воды в Нью-Йорке: атомная электростанция Indian Point, часть 2.

Проблема радиоактивной воды в Нью-Йорке: атомная электростанция Indian Point, часть 2.

How 280B Soda & Beer Cans Are Made Each Year. Free Mega Industrial Manufacturing Documentary

How 280B Soda & Beer Cans Are Made Each Year. Free Mega Industrial Manufacturing Documentary

Xtreme Drilling Animation: Coiled Tubing servies

Xtreme Drilling Animation: Coiled Tubing servies

The Logic Behind Catamaran Hulls

The Logic Behind Catamaran Hulls

100-500 MW Flexicycle™ Gas Power Plants | Wärtsilä

100-500 MW Flexicycle™ Gas Power Plants | Wärtsilä

Mają panele, pompę ciepła i magazyn energii. Grzeją się przy kominku

Mają panele, pompę ciepła i magazyn energii. Grzeją się przy kominku

How Crocodile Leather Suitcases Are Made in Modern Factories

How Crocodile Leather Suitcases Are Made in Modern Factories

30 Minutes Of Amazing Continuous Production Machinery & Most Admirable Worker Ever Before ▶31

30 Minutes Of Amazing Continuous Production Machinery & Most Admirable Worker Ever Before ▶31

What If You Keep Slowing Down?

What If You Keep Slowing Down?

Xtreme's Coiled Tubing services animation

Xtreme's Coiled Tubing services animation

Tech Transfer Our RESULTS are YOUR solution

Tech Transfer Our RESULTS are YOUR solution

Inside the Sheep Leather Factory: From Raw Sheep Skin to Luxury Goods

Inside the Sheep Leather Factory: From Raw Sheep Skin to Luxury Goods

The INSANE $4.4BN Queensland MEGA Dam Rebuild

The INSANE $4.4BN Queensland MEGA Dam Rebuild

Inside the Gold Refining Plant: How Rock Turns Into Pure 24K Gold Bars (Full Process)

Inside the Gold Refining Plant: How Rock Turns Into Pure 24K Gold Bars (Full Process)

Inside Camel Slaughter Factory: Full Camel Skin Processing to Luxury Goods

Inside Camel Slaughter Factory: Full Camel Skin Processing to Luxury Goods

© 2025 dtub. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: infodtube@gmail.com