Incremental launching method - ULMA Construction [en]
Автор: ULMA Construction
Загружено: 2014-06-25
Просмотров: 51499
Bridge construction by incremental launching with ENKOFORM HMK.
Each stretch of the bridge deck is manufactured in a fixed pre-fabrication area behind the abutment. Each new stretch is joined to the previously built and pushed by a hydraulic system, so that the bridge deck is sliding on the piers previously built.
Subscribe now: http://goo.gl/Qwbp6X
http://www.ulmaconstruction.com/en
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: