Transformer Delivery (4 of 4) - Final Miles
Автор: Buckingham Heavy Transport
Загружено: 2021-09-22
Просмотров: 13221
The final episode of this transformer delivery series shows the transformer being self-propelled on 12 lines of Goldhofer PST/SL-E the last couple of miles to the substation. In different places along the route, the road was only a foot or two wider than the trailer with a steep ditch on either side. Also, there were several steep grades where a Cat D9 bulldozer helped us up a hill or was an additional control while going down a hill. The transformer was successfully delivered to the substation and set on its new concrete foundation.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: