Battery Energy Storage System Powers Tower Cranes on Data Centre Construction Project
Автор: Blue Diamond Machinery
Загружено: 2024-01-23
Просмотров: 237
Construction company Kapitol Group adopted two of our construction-ready BESS units as a diesel-free solution to power tower cranes on-site during on a data centre construction project in Victoria.
These battery energy storage systems acts as a drop-in solution to either supplement or completely replace diesel generators on construction sites. They can power any type of heavy electrical equipment, but is particularly well suited to powering high-power equipment with intermittent loads, like tower cranes.
Using lithium-ion battery technology, they have a 70-90% lower carbon footprint and produces 30x less noise than a diesel generator.
Visit https://bit.ly/3cckpkA or get in touch with our team at 1800 237 670

Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: