Bathroom Completely Redone
Автор: ItsFixable
Загружено: 2022-12-31
Просмотров: 353
This video shows every step of a complete bathroom renovation, and moves quickly through 39 days of labor, yet offers enough detail to inform anyone who may be considering taking on such a project.
#bathroomremodel #bathroomremodeling
Video Chapters
0:00 Introduction
01:06 The original bathroom
02:25 Day 1 - Interior dismantling begins
02:57 Demolition and removal of sink, counter, and cabinets
04:39 Removal of plate glass mirror
05:38 Tear out of vinyl linoleum flooring
06:11 Evidence of flood damage uncovered
06:30 Demolition of tile shower begins
06:48 Day 2 – Demolition of shower tile continues
08:25 Day 4 - Opening crawl space access to plumbing
08:53 Removal of ABS drain and vent pipes
09:33 Day 6 - Removal of copper water lines
10:28 Day 7 – Preparation for ABS sewer vent pipe
10:40 Day 9 – Installation of ABS sewer vent pipe
11:32 Preparing for installation of new copper water lines
11:48 Day 10 – Soldering new copper water lines
12:20 Day 11 – Copper installation and soldering continues
12:52 Day 12 – Installing new electrical wire
14:33 Day 13 – Framing in for new window
15:15 Day 14 – Removal of heater vent boot and duct
16:09 Relocation and installation of new heater boot and duct
16:54 Day 15 - New in wall insulation
17:09 Day 17 – Installing new ABS shower trap and drain
17:50 Sealing up crawlspace access
18:12 Installing new shower pan
19:23 Day 18 – Drywall installation
21:36 Day 19 – Drywall mud and taping
22:11 Day 20 – Installation of plywood underlayment
22:24 Day 21 - Installation of double hung window
23:52 Day 22 – Installing floating vinyl plank floor
25:03 Day 24 – Painting of finish coat
25:49 Day 25 – Installing the toilet
26:32 New vanity assembly
27:14 Day 28 – Installing baseboards
28:20 Day 29 – Installing electrical outlets
28:50 Day 30 – Installing vanity, marble counter, and connecting plumbing
30:11 Day 31 – Hanging a frameless mirror
30:47 Completing shower pan trim
31:02 Day 34 – Installing acrylic wall tiles
31:56 Day 36 – Installation of acrylic tiles continues
32:11 Day 38 – Installing round glass shower surround
32:33 Day 39 – Installing washlet toilet seat
33:06 The completed bathroom
Thanks to the following music libraries and the contributing musicians.
YouTube audio library: / audiolibrary
“I Feel Like Partying Right Now” by Nat Keefe & Beat Mower
“Creek Whistle” by Steve Adams
“Sweet Relief” by Zachariah Hickman
“Zula” by Mini Vandals
“Carefree Melody” by Twin Musicom
is licensed under a Creative Commons Attribution 4.0 license. https://creativecommons.org/licenses/...
Source: http://www.twinmusicom.org/song/302/c...
Artist: http://www.twinmusicom.org
“Where I’m From” by Topher Mohr & Alex Elena
Slip.Stream
“The Good Stuff” - https://slip.stream/tracks/a4f5a6fd-0...
“Hopeful Rock” - https://slip.stream/tracks/403ced64-4...
(Median filter applied)
“All’s Well” - https://slip.stream/tracks/ebb7a4c6-f...
Filmmusic.io
“Dirty Spoon in the Sink” by Agnese Valmaggia
Free download: https://filmmusic.io/song/7230-dirty-...
License (CC BY 4.0): https://filmmusic.io/standard-license
“Imagefilm-008” by Sascha Ende
Free download: https://filmmusic.io/song/233-imagefi...
License (CC BY 4.0): https://filmmusic.io/standard-license
(Timing modification applied)

Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: