Rhodar has been awarded the pre-construction enabling works package for the Findel Industrial Complex in Middleton, Greater Manchester.
A 48-week project, across a 57,800m² site footprint incorporating nine interconnected buildings. The large site was formerly a wartime aircraft production & warehousing facility.
Acting as Principal Contractor, our extensive scope of works will encompass:
• Full soft strip
• Asbestos removal
• Mechanical Demolition
• Foundation slab removal
• Ground preparation
All delivered efficiently through a concurrent works programme, which commenced in September 2024.
The perimeter of the site presents a number of constraints, including the M60 motorway and a railway line, in addition to the adjoining, occupied buildings along one edge of the site, where we will be undertaking hand separation works and follow-on recladding of the exposed elevations. High voltage overhead powerlines lines also add additional complexity to our project delivery planning.