Arizona Gold Prospecting (The Trommel Build Part 9)
Автор: Goldstryker
Загружено: 2016-05-02
Просмотров: 1437
We have installed the top half of the drive system. Main sprocket has the chain wrapped between it and the drive sprocket. The drive sprocket is on the shaft with the 12 inch double pulley. The shaft is secured between two bearings. The big part of this video is where my son, Alec, installs the half ton crane on the trommel trailer.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: