QM EWM /SCWM/QINSP_S4, QA32, QA11 EWM QM integration $
Автор: Rahul Tyagi
Загружено: 2025-03-11
Просмотров: 2685
QM
Pre-req
1. WPT determination
2. Document type determination
3. POSC with QIS- quality step
4. Make QIS as rule based step to skip this step when inspection lot is not created for the HU line item in HU.
5. Packing in IBD in S4 or EWM is mandatory before GR. Pack in IBD in S4 , Pack in IBD in EWM in PRDI, Pack in RF, Pack instruction to pack in IBD POP1, SCWM Packspec in EWM. WOCR and packprofile which packspec. UPB
6. WT creation when Door is determined in the IBD before Proceeding with RF to do complex unload(not necessary that it would be a unload WT).
7. EWM QM config is done.
8. S4 QM config is done.
9. Master data covering the Inspection plan is done.
10. IOT 4 in EWM is activated
Inspection Lot creation:
1. Creation of single Lot per line item
2. Creation of lot per material/batch combination
Config setup
Code group
Codes
Selected set Code group Code EWM Full Partial UD backend code FM for full partial
Plant Selected set for full partial
Partial UD
1. Total quantity is split into accepted and partial rejected
2. Multiple HU with same Inspection Lot and UD for few out of all the HU is carried out.
Issue:
trigger follow up button in S4 comes by marking check box in EWM for WH IOT setting.
error- putaway not completed for posting change error comes when only single line item is selected at UD , we need to select both line item with or without Hu and then only we can mark the complete HU button after doing trigger follow up for all line items
Master data:
1. /scwm/QRSETUP
2. Inspection Plant/ Sampling procedure
3. Material master - QM view - inspection type
UD tcode
1. /SCwm/QINSP_S4
2. QA11
3. QA32
POSC setup
Step: QIS
Work center
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: