Anchorhandling double stevpris in line
Автор: Maersk OSV Modelling
Загружено: 2018-05-06
Просмотров: 4080
First test to pull two Anchors in line on deck Maersk Master.
At the main chain the Stevshark is connected and there after the stevpris.
But to control the vessel in the right position but also control the winch and Towing Pins it isn't possible to wash the Stevshark in the right position before pull on deck.
So against all rules the stevshark is pulled upside down on deck
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: