Sunkoshi Marin (SMDMP) Drone Footage of Robbins TBM
Автор: TheRobbinsCo
Загружено: 2022-10-26
Просмотров: 964
On October 14, 2022, a 6.4 m diameter #Robbins Double Shield TBM became Nepal's second-ever TBM launch. The machine is now boring the Sunkoshi Marin Diversion Multipurpose Project (SMDMP), a more than 13 km long tunnel through sandstone, siltstone, mudstone and conglomerate. The tunnel, which travels through the mountains of southern #Nepal, will be used for both irrigation and hydropower. Find out more at www.RobbinsTBM.com
Music: Music from Uppbeat (free for Creators!):
https://lnkd.in/dd_XPBtE
License code: K7XWA5N6PYKXIENC
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: