Woodrow Wilson Bridge - Full Lift 2025
Автор: Jon Transit
Загружено: 2025-07-11
Просмотров: 2825
The Woodrow Wilson Bridge is a bascule bridge along the Capital Beltway on I-95/I-495. Bridge lifts occur about once every month for testing, but may open more frequently for boats not able to fit under the 70 foot span.
You can find more about the bridge here: https://en.wikipedia.org/wiki/Woodrow_Wils...
Bridge lifts for testing typically take about 10-15 minutes, but may take longer in certain situations.
Test openings occur typically on a schedule, however they typically occur after 10 PM when traffic is lighter.
This bridge lift occurred at 12 am sharp.
Bridge lifts that are scheduled are typically posted on AlertDC (DC Alerting System) and the 511 Virginia website under "Bridge Openings".
For those interested in parking and viewing this bridge, my suggestion is to park along S Washington Street. An address I use for my GPS is 913 S Washington St. MAKE SURE you do not park in the bus stops (and note parking signs). There are two sets of pedestrian gates on the bridge; sometimes you are permitted to cross the first, but NOT the second (you're allowed to go where the signs and viewing things are). DO NOT cross onto the roadway for any reason!
Feel free to put any questions or comments below, and I will try and answer any questions about the bridge lifts.
For those requesting access to these videos for commercial purposes or other related uses, please reach out to me or put a request in the comments below. Do not use this video without express permission from me.
© Jon Transit 2025
All rights reserved
It is not permitted to use this video for training or generation from Artificial Intelligence or learning-based models for any reason.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: