Tanah Merah Modification Project: A Full Showcase of Tanah Merah New Platform A (Eastbound) & ECID
Загружено: 2025-12-08
Просмотров: 2722
~VIDEO INFO 🎬~
Date of film: 8 December 2025
Start time of film: 1.24pm
End time of film: 1.56pm
Duration of film: 28 min 30 s
Locations of film: EW5 Bedok, EW4/CG Tanah Merah, EW3 Simei, CG1 Expo
Filming device: iPhone 13 Pro Max
Video resolution: HD
Video smoothness: 60fps
High-dynamic range technology: Dolby Vision
Lens used: Ultra-wide
~MRT ROLLING STOCK INFO 🚈~
Builder: CRRC Changchun Railway Vehicles-Alstom Transportations
Manufactured in: Changchun, Jilin Province, People's Republic of China
Model: C151A
Electrification method: 750V DC Third Rail
Lines served: East West Line, North South Line
Operator: SMRT Trains
Number of carriages: 6
Train type: C
Train length: 138.86m
~MRT SET 1 INFO 🚃~
Set number: 893/894
Automatic Track Inspection: No
Carriage filmed in: 11893
Run number of the day: T307
Dispatched from: Tuas Depot
Status: FD (LN)
Start of ride: EW5 Bedok
End of ride: EW3 Simei
Remarks: New Platform A & new eastbound tracks and viaducts! 🎉
~MRT SET 2 INFO 🚃~
Set number: 921/922
Automatic Track Inspection: No
Carriage filmed in: 11922
Run number of the day: T309
Dispatched from: Tuas Depot
Status: FD (LN)
Start of ride: EW3 Simei
End of ride: EW4/CG Tanah Merah
Remarks: New westbound viaduct, new Tanah Merah track layout & ultra-wide view of East Coast Integrated Depot! 🔥🔥🔥
~MRT SET 3 INFO 🚃~
Set number: 891/892
Automatic Track Inspection: No
Carriage filmed in: 11892
Run number of the day: T102 (Replaced 689/690; 903/904)
Dispatched from: East Coast Integrated Depot (ECID)
Status: FD
Start of ride: EW4/CG Tanah Merah
End of ride: CG1/DT35 Expo
Remarks: New ECID TEL track connection & new CGL track layout! 🔥
~MRT SET 4 INFO 🚃~
Set number: 907/908
Automatic Track Inspection: No
Carriage filmed in: 11908
Run number of the day: T101
Dispatched from: ECID
Status: FD LN
Start of ride: CG1/DT35 Expo
End of ride: EW4/CG Tanah Merah
Remarks: New CGL Tanah Merah double-track layout to be commissioned after decommissioning Changi Depot & reopening of platforms B & C, preview
~MRT LINES INFO 🚊~
Lines: East West Line (EWL), Changi Airport Extension (CGL)
Colour: Green 🟢
Length of line: 57.2km
Operator: SMRT Trains
Start of journey: EW5 Bedok
End of journey: EW4/CG Tanah Merah
Maths Star films R151s sets 893/894 & 921/922 running as T307 & T309 respectively along the EWL, as well as R151s sets 891/892 & 907/908 running as T102 & T101 respectively along the CGL, on the 8 December 2025. These were all filmed on the first day of formal operations of both the new eastbound Platform A at Tanah Merah MRT station and the ECID as part of the Tanah Merah Modification Project (TMMP).
The EWL Shut Down 2 end date was brought forward by one day and with a new week, East West Line train operations resumed with dispatches and withdrawals from ECID instead of Changi Depot starting on the same day!
The track layouts have been completely altered as relevant track crossings between EWL mainline & CGL have been dismantled to facilitate the integration of CGL into the TEL extension by mid-2030s. A reception track hence also connects to the ECID TEL sector from the CGL. As the old EWL westbound & eastbound viaducts will be used for CGL, new viaducts were constructed for the EWL that connect to the ECID.
Towards the end of the video, there is also a tour of the newly expanded concourse of Tanah Merah MRT station & new platform A. There’s also new RATiS format at Tanah Merah! Though, the downside was that R151 still played the old transfer announcements for Tanah Merah. For details of the TMMP and how it looks like transitioning to ECID, please watch this video and look at what I’ve filmed!
Subscribe to Maths Star A9569 and turn on all notifications for more public transportation & transit race content! 🔔🛎️📣
On behalf of the entire public transport community, Maths Star would like to wish everybody a happy holidays in line with Christmas season upcoming! 🎄🎅😇
TIMELINE ⏰:
0:00 EW5 Bedok
0:04 Onboard 893/894
0:49 EW5 Bedok → EW4 Tanah Merah
3:24 EW4/CG Tanah Merah [1]
3:28 A look of the new platform A
4:35 EW4 Tanah Merah → EW3 Simei (New Eastbound Viaduct)
7:59 EW3 Simei
8:16 921/922 Arriving & 893/894 Departing
8:44 Onboard 921/922
9:37 EW3 Simei → EW4 Tanah Merah (New Westbound Viaduct)
13:09 EW4/CG Tanah Merah [2]
13:29 Updated Locality Map
14:13 Updated Rail System Map
15:10 891/892 Arriving
16:31 CG Tanah Merah → CG1 Expo (New ECID)
19:03 CG1/DT35 Expo
19:42 891/892 Departing
20:24 907/908 Arriving
21:10 Onboard 907/908
21:32 CG1 Expo → CG Tanah Merah (New Track Layout)
24:14 EW4/CG Tanah Merah [3]
25:11 907/908 Departing
25:51 Touring the expanded concourse
27:21 Back at the new Platform A
28:25 Thanks for watching! :)
COPYRIGHTS WARNING ⚠️:
All copyrights reserved. No unauthorised duplication, republication, reproduction, remixing or redistribution of my videos or thumbnails without prior permission sought from the creator.
#singaporemrt #smrt #eastwestline #trainenthusiast #fypシviralシ2025
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: