Squirter® DTI Installation
Автор: Applied Bolting Technology
Загружено: 2025-10-15
Просмотров: 154
Learn how to properly install Squirter® DTIs (Direct Tension Indicators) following AISC/RCSC Section 8 standards. In this step-by-step demonstration, VP of Sales and Technical Support Rob Westover walks you through snug-tight connections, full-tension tightening, and the Visual Verification of Bolt Tension™ process.
See how Squirter® DTIs make installation faster, safer, and more reliable thanks to the unmistakable Safety Orange media that appears when proper bolt tension is achieved. This visual confirmation means no guesswork or re-checks, just accurate, consistent results every time.
Whether you’re working on bridges, buildings, or other structural-steel projects, Applied Bolting Technology™ helps you build with confidence and compliance.
You can contact the team at www.appliedbolting.com
#SquirterDTIs #BoltTensioning #structuralengineering
00:10 Assembly Orientation
00:18 Snug Tight
00:20 Tighten to Full Indication
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: