WHSS Case Study
Автор: Jupiter Construction
Загружено: 2023-02-20
Просмотров: 260
📍 William Henry Smith School
We are really pleased to be able to finally share with you our case study for the recently completed project at WHSS
This project involved the refurbishment of the Lowry Building into a therapy teaching accommodation and the conversion of Buildings 5 & 6 into a residential area which included six bedrooms with ensuites
It was imperative that the final result was fit for purpose and met the needs of both the Client and the end user
There were many logistical issues to navigate on this project due to the location and limited space, alongside the school remaining open, so safety and security was paramount
Well done to everybody who was involved with this project
#construction #jupiterconstruction #refurbishment #education #yorkshire #internalrefurbishment #teamwork
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: