Golder Associates Uses PLAXIS on Tunnels
Автор: Virtuosity Software
Загружено: 2025-10-20
Просмотров: 20
Located on Hong Kong Island, the Western Island Line is a fully underground railway that alleviates heavy traffic congestion in the western district. The USD 200 million Western Island Line contract involved constructing two single-track tunnels surrounded by existing infrastructure. Golder Associates (Hong Kong) Limited (GAHK) was consulted to help the contractors overcome the project’s unprecedented geotechnical challenges. GAHK needed to meet the required special grouting protective measures beneath several buildings along the tunneling route. Find out how they did it.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: