Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
dTub
Скачать

Assignment Problem Part - 4 Profit Maximization Unbalanced MBS 2nd Sem Production and Operation

Автор: EDU GLOBAL FOUNDATION

Загружено: 2021-08-18

Просмотров: 58747

Описание:

Assignment Problem Part - 4 || in Nepali MBS/BBA Production and Operation Management/ Quantitative Technique (QT)/Data analysis and Modeling (DAM)/ Statistics
Objective- Profit Maximization
Types - Unbalanced

Solution of Exam Question

Part 1. Introduction of Assignment
   • Assignment Problem Introduction Part - 1 M...  

Part 2. Cost Minimization (Balanced)
   • Assignment Problem  Part - 2 Cost Minimiza...  

Part 3. Time Minimization (Balanced)
   • Assignment Problem  Part - 3 Time minimiza...  

Part 4. Profit Maximization (Unbalanced)
   • Assignment Problem  Part - 4 Profit Maximi...  

For More:
Contact: [email protected]
Facebook   / subediksz  
Contact: 977-9849740419
EDU GLOBAL FOUNDATION
01-5218180

Assignment Problem  Part - 4 Profit Maximization Unbalanced MBS 2nd Sem  Production and Operation

Поделиться в:

Доступные форматы для скачивания:

Скачать видео mp4

  • Информация по загрузке:

Скачать аудио mp3

Похожие видео

Transportation Problem Part 6 in Nepali Profit Maximization Balanced Type  MBS BBA TU PU Solution

Transportation Problem Part 6 in Nepali Profit Maximization Balanced Type MBS BBA TU PU Solution

Simplex Method Part 1 Linear Programming Problem MBS 2nd Sem. Production and Operation Management

Simplex Method Part 1 Linear Programming Problem MBS 2nd Sem. Production and Operation Management

Lec-29 Assignment Problem Hungarian Method | In Hindi | Operation Research

Lec-29 Assignment Problem Hungarian Method | In Hindi | Operation Research

ABC inventory Model  - TU 2021 (MBS)

ABC inventory Model - TU 2021 (MBS)

Assignment Problem  Part - 3 Time minimization MBS 2nd Sem Production and Operation Management

Assignment Problem Part - 3 Time minimization MBS 2nd Sem Production and Operation Management

Transportation Problem Part 2 in Nepali Cost Minimization (Balanced Transportation) MBS BBA

Transportation Problem Part 2 in Nepali Cost Minimization (Balanced Transportation) MBS BBA

Lec-32 Maximization Assignment Problem | Unbalanced Example | In Hindi | In Operation Research

Lec-32 Maximization Assignment Problem | Unbalanced Example | In Hindi | In Operation Research

Assignment Problem | Production & Operations Management | MBS 2nd Sem |  Prajeet K. Timalsina

Assignment Problem | Production & Operations Management | MBS 2nd Sem | Prajeet K. Timalsina

Inventory Management Part 1 Material Management MBS 2nd Sem Production and Operation Management

Inventory Management Part 1 Material Management MBS 2nd Sem Production and Operation Management

Duality Changing Primal to Dual  MBS 2nd Semester Production and Operation Management LPP

Duality Changing Primal to Dual MBS 2nd Semester Production and Operation Management LPP

Transportation Problem Part - 1 Introduction in Nepali MBS 2nd semester Production and Operation

Transportation Problem Part - 1 Introduction in Nepali MBS 2nd semester Production and Operation

दुर्गाको फुर्ती मात्रै ठूलो,आजै राजा गद्दीमा बस्न सक्ने,सुशीलाले दुर्गालाई षड्यन्त्रमा लटपटाए,Shyam

दुर्गाको फुर्ती मात्रै ठूलो,आजै राजा गद्दीमा बस्न सक्ने,सुशीलाले दुर्गालाई षड्यन्त्रमा लटपटाए,Shyam

अख्तियारले भेट्यो विदेशमा उपचार गर्ने नेताको फायल, ओलीको उपचारमा देशको साढे २ करोड खर्च

अख्तियारले भेट्यो विदेशमा उपचार गर्ने नेताको फायल, ओलीको उपचारमा देशको साढे २ करोड खर्च

today news🔴live news | nepali news | mukhe khabar | mukhe samachar | december10,2025

today news🔴live news | nepali news | mukhe khabar | mukhe samachar | december10,2025

Today news 🔴 nepali news | aaja ka mukhya samachar, nepali samachar live | Mangsir 24 gate 2082

Today news 🔴 nepali news | aaja ka mukhya samachar, nepali samachar live | Mangsir 24 gate 2082

Managing For Quality Part 2  MBS Production and Operation Management Mean and Range Chart

Managing For Quality Part 2 MBS Production and Operation Management Mean and Range Chart

Assignment Problem Introduction Part - 1 MBS 2nd Semester Production and Operation Management

Assignment Problem Introduction Part - 1 MBS 2nd Semester Production and Operation Management

MRP Schedule

MRP Schedule

पूर्वप्रधानन्यायाधीश केसीले रबिलाई भेटे लगत्तै आयो गगन थापाले रोल्पाबाट चुनाव उठ्ने खबर Hemanta

पूर्वप्रधानन्यायाधीश केसीले रबिलाई भेटे लगत्तै आयो गगन थापाले रोल्पाबाट चुनाव उठ्ने खबर Hemanta

Assignment Problem | Hungarian Method | Unbalanced Assignment Problem

Assignment Problem | Hungarian Method | Unbalanced Assignment Problem

© 2025 dtub. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]