Inside a Hydroelectric Concrete Arch Dam Construction – From Bedrock Excavation to Reservoir Filling
Автор: Monolith Method
Загружено: 2025-12-25
Просмотров: 71
Step inside the construction of a concrete arch dam, from raw bedrock to a fully operational power structure.
This documentary-style breakdown shows how a concrete arch dam is built, step by step, revealing the hidden engineering behind massive hydro projects.
A concrete arch dam relies on precise geometry, rock strength, and staged construction to transfer immense water pressure into the canyon walls. Every phase must be executed in sequence to ensure stability, longevity, and power generation readiness.
You will see the full process:
Geological surveys and canyon analysis
Bedrock excavation and foundation preparation
Rock anchoring and grout curtain installation
Concrete batching, cooling, and placement in lifts
Formwork shaping the arch curvature
Spillway and outlet works construction
Powerhouse integration and turbine alignment
Structural curing and monitoring systems
Reservoir impoundment and controlled filling
Final testing and power-on sequence
Why this matters: concrete arch dams are among the most material-efficient and structurally demanding megastructures ever built. Their success depends on extreme precision, logistics, and engineering discipline—where small errors can scale into massive risks.
Watch the full deep-build process and understand how gravity, geometry, and rock work together to control water at an enormous scale.
⚠️ This content was generated with artificial intelligence for educational and visual purposes.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: