61306 Mayflower The Fellsman 6th August 2025
Автор: steam chasers
Загружено: 2025-08-07
Просмотров: 344
LNER B1 61306 Mayflower
The Fellsman
The 6th August 2025 was a day of sound without sunlight. Storm Floris was still hanging about and bringing more cloud with it.
Starting at Keckwick with the little amount of sun not playing ball and disappearing as soon as the train arrived.
Next was Ramsgreave and a signal check meaning a standing start from Daisyfield Junction making for a longer climb than usual.
A long wait in the gloom at Selside due to a 51 minute delay at Hellifield.
The return was caught at Helm tunnel, with no water stop at Appleby, Mayflower sped though the tunnel and began the climb with ease.
We then see her at Langho for last time today.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: