Malaysia has welcomed its largest padel club project, which is equipped with multiple super panoramic padel courts, perfectly embodying the combination of sports and art. UNIPADEL provided technical guidance for this installation project, demonstrating efficient execution and professionalism from design to installation.
Project Background and Requirements
With the rapid popularity of padel sports around the world, the demand for high-quality padel venues in Malaysia is growing. To meet the diverse needs of the club, the padel court installed this time adopts a super panoramic design with a wide field of view and a very modern appearance. The court structure must meet international standards while taking into account high-frequency durability and minimal maintenance requirements.
Installation process: a perfect combination of efficiency and precision
Preliminary planning and logistics
Before the project started, the UNIPADEL team had in-depth communication with the club management team to learn more about the area, environmental conditions and drainage requirements of the venue. According to the plan, all court materials were shipped directly to the site from the UNIPADEL factory. During the shipment process, each piece of material was accurately marked to ensure transportation safety and simplify the installation process.
Site preparation: attention to detail
Before installation, the site foundation construction has been completed, and the UNIPADEL technical team arrived in advance to confirm whether the site level, waterproof layer and foundation frame meet the standards. With years of experience, the team quickly adjusted the possible minor deviations, laying a solid foundation for subsequent installation.
Stadium installation: fast and efficient
Frame construction: The panoramic stadium adopts high-strength steel structure, and the column frame is quickly assembled on site through prefabrication process to ensure stability and beauty.
Glass wall installation: Each piece of tempered glass is precisely measured and fixed to the frame using special tools and techniques. The whole process strictly follows safety standards to avoid any errors.
Turf laying: The turf provided by UNIPADEL is high-density and durable grass fiber, which protects the safety of athletes and improves the elasticity of the ball. After the turf is laid, the team uses professional equipment to fix and trim it.
Lighting system: Energy-saving LED lamps are reasonably arranged to ensure the uniformity and comfort of night lighting, meeting the needs of long-term training and competition.
Testing and Acceptance
After installation, the UNIPADEL team conducted a comprehensive test on the courts, including frame stability, glass impact resistance, lawn flatness, and lighting effects. The test results showed that all courts met international competition standards.