#Confirm that the parallel installation of #schneider Easy UPS 100kVA (3 Phase) systems has been successfully completed by the #vs #creators #victor #masih engineering team.
🔧 Scope of Work Completed:
Installation of two (2) Schneider Easy UPS 100kVA units in parallel configuration
Integration of Schneider parallel communication kits
Input, output, and bypass panel wiring with appropriate cable sizing and protection
Installation of separate SMF battery banks with proper DC cabling and isolation
Parallel communication setup and system configuration
System testing: load sharing, redundancy, and synchronization
Commissioning and handover with all parameters verified as per Schneider guidelines