GHL ION Director Initial Setup *Updated*
Автор: K R
Загружено: 2021-05-09
Просмотров: 7171
GHL ION Director Initial Setup Updated
This video is the initial Setup of the GHL ION Director and Doser. This video steps you through the installation of the ION Director and Doser along with the configuration of both the ION Director and Doser using the GHL Connect App.
Updated - Special thanks to mggray87 of Humblefish who pointed out to me that I forgot to talk about the Wastewater line. Great catch, I had it in the original video and when I was editing cut it out of the final video, my mistake. This video includes the Wastewater line and a reminder of the vent line.
𝐓𝐡𝐞 𝐒𝐜𝐚𝐥𝐞 𝐈 𝐚𝐦 𝐮𝐬𝐢𝐧𝐠 𝐰𝐡𝐞𝐧 𝐂𝐚𝐥𝐢𝐛𝐫𝐚𝐭𝐢𝐧𝐠 𝐭𝐡𝐞 𝐃𝐨𝐬𝐢𝐧𝐠 𝐏𝐮𝐦𝐩𝐬: https://www.inevifit.com/product/inev...
𝐒𝐨𝐦𝐞 𝐇𝐢𝐠𝐡𝐥𝐢𝐠𝐡𝐭𝐬 𝐨𝐟 𝐭𝐡𝐞 𝐕𝐢𝐝𝐞𝐨:
1:30 - Stack and Side by Side Configuration
2:30 - ION Probe Installation
8:00 - Assigning the ION Director and Doser to the ProfiLux Controller
9:05 - Numbering Dosing Pumps
10:45 - Configuring and Calibrating the Water Sample Dosing Pump
11:10 - Importance of Calibration of Dosing Pumps and how I do it
12:13 - Configuring and Calibrating the Reference A Solution Dosing Pump
13:31 - Configuring and Calibrating the Reference B Solution Dosing Pump
14:40 - Installing Dosing Tubes between Doser and ION Director
16:07 - Installing Water Sample Line and Water Filter. (Important Step)
18:13 - Installing Wastewater Line, and reminder of the Vent line
18:40 - Enabling the ION Director for Use
19:04 - Configuring the Dosing Pumps to use the ION Director
19:35 - Entering the Water Sample Volume for the ION Director
20:20 - Preparing the Cell for the First Measurement.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: