How to Calculate Cement, Sand & Aggregate for M25 Concrete | Rate Analysis of 1m3 M25 Concrete |
Автор: Civil Engineers 07
Загружено: 2025-11-03
Просмотров: 377
How to Calculate Cement, Sand & Aggregate for M25 Concrete | Rate Analysis of 1m3 M25 Concrete |
In this video, we will learn how to calculate the quantity of Cement, Sand & Aggregate required for 1m³ M25 Grade Concrete, along with detailed rate analysis.
This method is helpful for site engineers, contractors, civil students and those who are working in construction & estimation works.
🔍 Topics Covered:
1. What is M25 Grade Concrete
2. Mix Ratio of M25 (Nominal Mix / Design Mix Concept)
3. Calculation of Cement, Sand & Aggregate (dry volume method)
4. No. of Cement Bags in 1m³ M25
5. Rate Analysis with Latest Market Rates
6. On-site Practical Tips
💡 Formula Used:
Dry Volume = Wet Volume × 1.54
M25 Mix Ratio = 1 : 1 : 2 (Nominal Mix for learning purpose)
🎯 Example:
For 1m³ M25 Concrete
Cement = __ kg = __ Bags
Sand = ___ m³
Aggregate = ___ m³
(Complete Calculation shown in video)
If you find the video helpful, LIKE, SHARE & SUBSCRIBE ❤️
For more such practical site videos 👉 Civil Engineers 07
#M25Concrete #RateAnalysis #CivilEngineering #CementSandAggregate #Construction #ConcreteCalculation #CivilEngineers07