Inside the $300M Floating Fortress Building a 100 Meter Mega Yacht (Full Process)
Автор: NeoFactory Process
Загружено: 2025-12-28
Просмотров: 264
100 meters of steel. 400,000 man-hours. One singular goal: total maritime dominance.
Welcome to the NeoFactory Process. This is the complete manufacturing journey of the Aegis-100 Ultra-Luxury Explorer, an ice-class titan designed to bridge the gap between industrial invincibility and 7-star opulence.
This 19-minute documentary follows a strict "Industrial ASMR" pacing, capturing every stage of construction—from the first 10,000-watt laser strike on raw AH36 steel to the final high-speed sea trials in the Arctic.
🛠️ The Manufacturing Phases
The Steel Phase: Witness the precision of fiber lasers and 500-ton hydraulic presses shaping the hull.
The Skeleton: Exploration of the Longitudinal Framing System that allows the Aegis-100 to flex against 20-foot swells.
The Marriage: Watch as 150-ton "Mega-Blocks" are aligned with 0.00mm deviation using laser-guided transporters.
The Science: Deep dives into Explosion-Bonded Transition Joints and Computational Fluid Dynamics (CFD).
🕒 Timeline
0:00 – The Engineering Intent & Prologue (Scenes 1-6)
0:48 – Precision Cutting: 10,000-Watt Fiber Lasers (Scenes 7-17)
2:16 – The Science of Steel: Hydraulic Hull Shaping (Scenes 18-22)
2:56 – Internal Skeleton: The Longitudinal Framing (Scenes 23-30)
4:00 – Mega-Block Movement: The 40-Axle SPMT (Scenes 31-35)
4:40 – Fusion: Deep Seam Submerged Arc Welding (Scenes 36-40)
5:20 – Hydrodynamics: The Bulbous Bow & Tank Testing (Scenes 41-47)
6:16 – Structural Foundation: Engine Bed Alignment (Scenes 48-55)
7:20 – Engine Marriage: Dropping the 5,000hp Powerplants (Scenes 56-72)
9:36 – The Superstructure: Aluminum to Steel Fusion (Scenes 73-90)
12:00 – Exterior Fairing: Achieving the Mirror Finish (Scenes 91-105)
14:00 – Interior Architecture: $100M Luxury Outfitting (Scenes 106-125)
16:40 – Systems Integration: Electronics & Navigation (Scenes 126-135)
18:00 – Sea Trials: Arctic Capability Testing (Scenes 136-144)
📐 Technical Specs: Aegis-100
Hull: Grade AH36 High-Tensile Marine Steel
Superstructure: Sealium Aluminum
Propulsion: Twin 5,000hp High-Output Marine Diesels
Range: 9,000 Nautical Miles
Specialty: Ice-Class Bulbous Bow & Explosion-Bonded Joints
Enjoy the precision of the NeoFactory Process?
🔔 SUBSCRIBE for more industrial deep-dives.
💬 COMMENT: Which scene had the best ASMR? The laser "zip" or the arc welding "sizzle"?
#MegaYacht #Engineering #Shipbuilding #IndustrialASMR #NeoFactory #Aegis100 #Manufacturing #howitsmade
🤖 AI DISCLOSURE & TRANSPARENCY
In compliance with YouTube’s "Altered Content" policies and commitment to viewer transparency: NeoFactory Process utilizes advanced AI generation technology, 3D visualization, and synthetic media to illustrate complex manufacturing environments and industrial processes. These visuals are meticulously crafted for educational entertainment, allowing us to visualize restricted or high-complexity facilities that are otherwise inaccessible to traditional cameras. Our goal is to provide a high-fidelity, conceptual understanding of process engineering.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: