🏠 How to Build the Foundations of a Mini Wooden House
Автор: OUROBOROSARQ
Загружено: 2024-12-07
Просмотров: 15157
We invite you to discover our amazing product! We know you'll love it, and to make it even more special, we want to offer you an exclusive discount code.
10% Off Code: 9AIJEBOJ
End Date: 12/31/2024 11:59 PM PDT
Product Link: https://www.amazon.com/dp/B0DDK7B9RR
15% Discount Code: OURO15
Available Sitewide at Cigman.com
CM-S02: https://cigman.com/products/cm-s02-4x....
Don't miss the chance to try it and enjoy its benefits. We're sure you'll love it! If you have any questions, feel free to contact us.
Happy shopping! 🛒✨
The strip footing foundation is a widely used option, especially for single-story houses or light structures. Here I explain the process in a simple way:
1. Study of the terrain: Before starting, it is essential to carry out a study of the soil to determine its load-bearing capacity and the characteristics of the terrain. This will help to design the appropriate foundation.
2. Design of the footing: Based on the study of the terrain, the strip footing is designed, which is a concrete structure that extends along the walls of the house. Its width and depth are determined according to the loads it will support.
3. Excavation: Excavation is carried out in the area where the footing will be placed. The depth and width will depend on the design, but generally a channel is dug that follows the line of the walls.
4. Gravel base: Once excavated, a layer of gravel or crushed stone is placed at the bottom of the channel. This helps drain water and provides a stable base.
5. Formwork: A wooden or metal formwork is built to shape the footing. This formwork must be strong and well leveled.
6. Reinforcing: Steel rods (reinforcement) are placed inside the formwork to reinforce the footing. This is important for the foundation to withstand stresses and loads.
7. Concrete Pouring: Concrete is poured into the formwork, making sure it is evenly distributed and air bubbles are removed. It is advisable to use good quality concrete.
8. Curing: After the concrete is poured, it is crucial to let it cure properly. This involves keeping it moist for several days to prevent it from cracking.
9. Removing the Formwork: Once the concrete has reached the necessary strength, the formwork is removed. This is usually done after a few days, depending on the type of concrete used.
10. Wall construction: With the continuous footing ready, you can begin building the walls of the house on it.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: