Adirondack Rail Trail: Floodwood to Tupper Lake
Автор: Gen X Outdoors
Загружено: 2025-10-09
Просмотров: 346
The third and final phase of the Adirondack Rail Trail -- from Floodwood to Tupper Lake -- was completed and officially opened on Oct. 4, 2025. We wasted no time and were out there biking the section on Oct. 8! This section was about 8 miles one-way, and joined with the Junction Pass connector trail to get from the Tupper Lake railroad station into downtown Tupper Lake. We grabbed sandwiches at Spruce & Hemlock on Park Street.
The entire trail from Lake Placid to Tupper Lake is 34 miles.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: