November 2022 Switching Operations On Our Lionel O Gauge Layout!
Автор: Alto Model Train Museum
Загружено: 2022-11-18
Просмотров: 1145
This is the first switching operations video on this layout that takes advantage of the updated yard/industrial area, and features the NS ET44AC Lion-Chief+ 2 engine! The plan was to pickup a tank car from the oil wells, an empty hopper from the coal load-out, a pair of flatcars with farm equipment and cement hopper from the main yard. The new section of the yard adds a "runaround" track which solves the switch direction issues the original yard plan had. The train crossed over, backed through the wye, made the first two pickups, the engine runs around, picks up the train, works the yard, and finally backs out on to the main again. Because of the placement of the yard, traffic had to be held up on the inner main line. There was also a brief run of Jim's pre-war Lionel passenger set!
[You can come visit us on our open house/work days Saturdays 10AM-2PM at 1117 9th Ave Altoona PA!] ALSO: Our "Lights On The Lake" display will be open November 18th 2022 through January 8 2023 6-10 PM nightly at the end of Lakemont Park's "Lights on the Lake" display through the gift shop building. Be sure to stop by if you're in the area!
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: