Will Thane Metro 4 open in December| Gaimukh to Cadbury Metro station update| Mumbai| Thane Metro
Автор: Santy's Vlogs
Загружено: 2025-11-02
Просмотров: 18534
Mumbai Metro Line 4, also known as the Green Line, is an elevated corridor connecting Wadala and Kasarvadavali in Thane, with a total length of 35.2 km and 32 stations. An extension, Line 4A, will connect Kasarvadavali to Gaimukh. The project is currently undergoing trial runs, with full passenger service expected by late 2025 or 2027.
Route: Wadala to Kasarvadavali
Length: 35.2 km
Stations: 32 stations
Extension: Line 4A extends the route from Kasarvadavali to Gaimukh
Status: Trial runs have begun on the line. The mmrda expects it to be fully operational by late 2025, while The Hindu indicates a 2027 timeline for full operation.
Significance: The mmrda is designed to provide relief to commuters and improve transport capacity in the eastern and central parts of Mumbai and Thane.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: